← Dashboard

OmmAlpha · VCP Stage Engine V3 Shadow

Read-only live comparison. Nothing on this page writes to production tables or changes ML predictions.

2026-10-01Live scan date
1Rows shadow-tested
0Stage classifications changed
vcp-stage-v3-shadow-1.0Shadow engine
Core V3 rule: pivot comes from confirmed swing resistance preceding the final contraction trough. A fresh breakout spike needs future bars before it can become a confirmed swing, so the pivot cannot chase the breakout upward the next day.
Why shadow mode first: Phase 2A ML was trained on the old detector population. Switching stage/pivot definitions without rebuilding historical signals and retraining would create model-population drift.

Stage distribution

Current production
  • BREAKOUT_PENDING: 1
V3 shadow
  • BREAKOUT_PENDING: 1

Live stage comparison

SymbolOld stageV3 stageDetailOld pivotV3 structural pivotV3 distancePivot evidenceContractionsBreakout evidenceConfidence
CYIENT
close 1,110.20
BREAKOUT_PENDING BREAKOUT_PENDING INTRADAY_PIVOT_TEST 1,107.20
0.27% above
1,107.20
2026-09-15
0.27% above CONFIRMED_SWING_RESISTANCE
touches 8
9.3% → 6.6% → 4.6% pivot crossed intraday but close confirmation is not complete 90%

CYIENT · V3 reasons

Thresholds: confirm 0.40% · failure buffer 2.43% · pre-breakout zone 5.46% · extended 8.09%